DOWNTOWN NANAIMO PRODUCTION CLOSURES

Production Closure Overview

CURRENT STATUS: ALL SHOPS ON COMMERCIAL STREET AND SURROUNDING DIANA KRALL PLAZA ARE STILL OPEN!
Please see maps below for detailed info.

From April 22nd to May 31st, some parts of Diana Krall Plaza will be closed to the public due to a production event.

Closures of other parts of the surrounding area will happen in short, planned phases.

Most shops and restaurants will still remain open during this time!

PHASE 1 – April 22 – May 31 (Diana Krall Plaza)
 
For Phase 1 Wharf Street and access to Diana Krall Plaza from Commercial Street will be closed to both vehicles and pedestrians . Maintained access to the library and parkade elevator.
 
  • Wharf St Closed
  • ALL BUSINESSES ON SKINNER ST & COMMERICAL OPEN AS USUAL
 
PHASE 2 – May 6 – 17 (Skinner St)
 
A second phase will close Skinner Street’s 200 block, with Harbour Front Parkade access remaining open.
 
  • Wharf St Closed
  • Skinner St Closed
  • ALL BUSINESSES ON COMMERICAL OPEN AS USUAL
 
PHASE 3 – May 10 – 15 (Commercial Street)
 
A final phase from May 10th to May 15th will close Commercial Street, affecting businesses and some parkade entrances, alongside prior closures.
 
  • Wharf St Closed / Skinner St Closed / Commerical St (Bastion to Terminal)
  • FULL LIST OF OPEN AND CLOSED SHOPS TO BE LISTED SOON.

SCROLL DOWN TO LEARN MORE

Phase 1

BEGINNING APRIL 22ND

ENDING MAY 31ST

DIANA KRALL PLAZA ACCESS & WHARF ST CLOSURE

• WHARF STREET CLOSED TO PUBLIC TRAFFIC & PEDESTRIANS

APRIL 22 – MAY 31

• NO ACCESS TO DIANA KRALL PLAZA FROM COMMERCIAL STREET

APRIL 22 – MAY 31

• ACCESS TO LIBRARY WILL BE MAINTAINED AT ALL ACCESS POINTS

•.PATHWAY TO NORTH ENTRANCE WILL BE CREATED

• ACCESS TO PARKADE ELEVATOR MAINTAINED

• GRANT HORNE LANE OPEN TO TRAFFIC

Phase 2

BEGINNING MAY 6th

ENDING MAY 17th

CLOSURE OF 200 BLOCK OF SKINNER STREET – FROM BASTION ST. DOWN TO COMMERCIAL ST.

• IN ADDITION TO PHASE 1 CLOSURES

• CLOSED TO PUBLIC TRAFFIC & PEDESTRIANS

• ALL ACCESS TO HARBOUR FRONT PARKADE OPEN

Phase 3

BEGINNING: MAY 10th

ENDING: MAY 15th

CLOSURE OF COMMERCIAL STREET – FROM BASTION ST. TO TERMINAL AVE

• MUSEUM WAY CLOSED ADDITIONALLY

• IN ADDITION TO PHASE 1 & 2 CLOSURES

• CLOSED TO PUBLIC TRAFFIC & PEDESTRIANS

• MOST BUSINESSES IN THE RED AREA WILL BE TEMPORARILY CLOSED

Full Phase Map

DOWNLOAD
THE FULL MAP PDF